Starting yesterday, Fore-Front Construction has started rebuilding green side bunkers on holes 1-13. This includes removing all the old sand, drain rock, drain lines and starting from scratch inside the bunkers. The bunkers here at Bear's Best Atlanta do not drain well, the sand is contaminated, the drain lines clogged and with severe slopes inside the bunkers, they wash out after a rain. The first step after cleaning them out is to soften the slopes inside the bunkers so that there is not a steep drop off right at the lip. This will help with fried egg lies around the edges and washing after a rain. They will then get the new drain lines and rock, be covered completely with a liner and filled with compacted sand. More pictures to follow.
|
bunker before pumping and washed out along edges |
|
#6 back bunker after pumping and crew shoveling sand back along edges |
No comments:
Post a Comment